To extend the deadline for commencement of construction of a hydroelectric project
Sponsor: JERRY COSTELLO (D-IL)
Authorizes the Federal Energy Regulatory Commission (FERC), at the request of the project licensee, and after reasonable notice, in accordance with specified good faith, due diligence, and public interest requirements and FERC procedures, to extend for up to three consecutive two-year periods the time period during which the licensee must commence construction of hydroelectric project numbered 12187 (in Illinois). Authorizes FERC to reinstate the license, effective as of its expiration date, if the existing period required for commencement of construction has expired before enactment of this Act.
Energy Topic assigned by the Congressional Research Service.
Who won, and how much of the country was behind them
The dotted gap is 3.9% of U.S. adults whose member did not vote, voted “present,” or whose seat was vacant.
| Side | Outcome | Votes | Share of U.S. adults |
|---|---|---|---|
| Yea | Won | 418 | 96.1% |
| Nay | Lost | 0 | 0.0% |
| Not represented on this question | No position taken | 0 | 3.9% |