In a perfect democracy, at least 50% of people would support every decision.

The U.S. falls short of this goal.

Activate to continue

Spoken For.
House vote: H.R. 2457 // June 12, 2017Needed two-thirds to pass

J. Bennett Johnston Waterway Hydropower Extension Act of 2017

Sponsor: Mike Johnson (R-LA)

(Sec. 2) This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the Red River Lock and Dam No. 3, 4, and 5 Hydroelectric Projects located on the Red River in Louisiana. The licensee is not required to pay an annual charge for administrative expenses until construction commences. FERC may reinstate the construction license if it is expired.

Energy Topic assigned by the Congressional Research Service.

Who won, and how much of the country was behind them

Won the vote · Yea

402 votes, representing 231,889,350 people92.2%of U.S. adults

Lost the vote · Nay

1 vote, representing 565,115 people0.2%of U.S. adults

The dotted gap is 7.6% of U.S. adults whose member did not vote, voted “present,” or whose seat was vacant.

Share of U.S. adults represented, the House
SideOutcomeVotesShare of U.S. adults
YeaWon40292.2%
NayLost10.2%
Not represented on this questionNo position taken07.6%